FEED

Front-End Engineering Design

Define the project precisely enough to sanction it with confidence.

Once a project is feasible, FEED defines the scope, cost and schedule precisely enough for a sanction decision. We produce the drawings, specifications and estimates your board needs to commit CAPEX with confidence.

When you need this

Typical trigger points

  • A feasible concept needs a Class-3 estimate for sanction.
  • Licensor or concept-level P&IDs exist but the execution basis does not.
  • A credible HAZOP and SIL basis is needed before detailed design begins.

What's included

Deliverables

  • Basis of design and design manuals
  • FEED-level P&IDs, PFDs, plot plans and GA drawings
  • Equipment datasheets and long-lead specifications
  • Class-3 (±10%) cost estimate and Level-3 schedule
  • Integrated HAZOP, LOPA and SIL determination
  • Sanction-ready package for board approval

Our process

How an engagement runs.

  1. 1

    Kick-off

    Objectives, deliverables list, study protocols and schedule agreed.

  2. 2

    Option development

    Concept refinement, design basis, trade-off studies closed out.

  3. 3

    Design development

    P&IDs, GAs, equipment and instrument specifications issued for FEED.

  4. 4

    Safety and estimating

    HAZOP / LOPA / SIL run into the live design; bottom-up Class-3 estimate built.

  5. 5

    Sanction package

    FEED report, estimate, schedule and risk register issued for approval.

Talk to us about your FEED scope.